![]() |
37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 628064 |
Time | |
Date | 200408 |
Day | Tue |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | B777-200 |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : maintenance |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
ASRS Report | 628064 |
Person 2 | |
Affiliation | company : air carrier |
Function | other personnel other |
Events | |
Anomaly | aircraft equipment problem : critical maintenance problem : improper documentation non adherence : published procedure non adherence : far |
Independent Detector | other other : 1 |
Resolutory Action | none taken : detected after the fact |
Consequence | other other |
Factors | |
Maintenance | contributing factor : work cards contributing factor : engineering procedure performance deficiency : scheduled maintenance |
Supplementary | |
Problem Areas | Aircraft Maintenance Human Performance Chart Or Publication |
Primary Problem | Chart Or Publication |
Narrative:
While performing lanyard change for eco X, left generator lanyard was inadvertently changed. Connecting point attachment confign may also be an issue, as per paperwork being unclr.
Original NASA ASRS Text
Title: A B777 ENGINEERING CHANGE ORDER FOR PAX OXYGEN GENERATOR LANYARD CONNECTING POINT ATTACHMENT MAY BE INCORRECT DUE TO UNCLR ENGINEERING INSTRUCTIONS.
Narrative: WHILE PERFORMING LANYARD CHANGE FOR ECO X, L GENERATOR LANYARD WAS INADVERTENTLY CHANGED. CONNECTING POINT ATTACHMENT CONFIGN MAY ALSO BE AN ISSUE, AS PER PAPERWORK BEING UNCLR.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.