ACN | 654646 |
Time | |
Date | 200410 |
Day | Sun |
Local Time Of Day | 0001 To 0600 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Environment | |
Light | Night |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | B767-400 and 400 ER |
Operating Under FAR Part | Part 121 |
Flight Phase | ground : maintenance |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : inspector |
Qualification | technician : powerplant technician : airframe technician : inspection authority |
Experience | maintenance technician : 2 |
ASRS Report | 654646 |
Person 2 | |
Affiliation | company : air carrier |
Function | oversight : supervisor |
Events | |
Anomaly | aircraft equipment problem : critical maintenance problem : improper maintenance maintenance problem : improper documentation non adherence : published procedure non adherence : far cabin event other |
Independent Detector | other other : 1 |
Resolutory Action | none taken : detected after the fact |
Consequence | other other |
Factors | |
Maintenance | contributing factor : manuals performance deficiency : logbook entry performance deficiency : inspection performance deficiency : non compliance with legal requirements |
Supplementary | |
Problem Areas | Chart Or Publication Maintenance Human Performance Aircraft |
Primary Problem | Maintenance Human Performance |
Narrative:
Found crack on left leading edge wing at #4 stabilizer outboard auxiliary track cutout. Placed on deferred item project #xxxxx per srm 57-41-01. Upon re-inspection of damage area (xx) apr/sun/05, found to be improperly signed off per the above srm. I did not remember if I originally signed this off. Wrote up damage as being out of limits per srm 57-41-01 and placed on deferred item project to be repaired within 10 days per engineering deferral authority/authorized. On apr/tue/05 received a copy of log page #xxxxxxxx that shows that I did originally sign off the log page on aug/tue/04. So I am filing this report at this time.
Original NASA ASRS Text
Title: A B768-400 INSPECTOR FOUND A CRACK ON L WING LEADING EDGE #4 SLAT OUTBOARD AUX TRACK CUTOUT. REPAIR DEFERRED FOR 10 DAYS. AT THE SAME TIME, THE INSPECTOR INADVERTENTLY CLRED THE DEFERRED ITEM FOR CRACK REPAIR.
Narrative: FOUND CRACK ON L LEADING EDGE WING AT #4 STAB OUTBOARD AUX TRACK CUTOUT. PLACED ON DEFERRED ITEM PROJECT #XXXXX PER SRM 57-41-01. UPON RE-INSPECTION OF DAMAGE AREA (XX) APR/SUN/05, FOUND TO BE IMPROPERLY SIGNED OFF PER THE ABOVE SRM. I DID NOT REMEMBER IF I ORIGINALLY SIGNED THIS OFF. WROTE UP DAMAGE AS BEING OUT OF LIMITS PER SRM 57-41-01 AND PLACED ON DEFERRED ITEM PROJECT TO BE REPAIRED WITHIN 10 DAYS PER ENGINEERING DEFERRAL AUTH. ON APR/TUE/05 RECEIVED A COPY OF LOG PAGE #XXXXXXXX THAT SHOWS THAT I DID ORIGINALLY SIGN OFF THE LOG PAGE ON AUG/TUE/04. SO I AM FILING THIS RPT AT THIS TIME.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.