Narrative:

Found crack on left leading edge wing at #4 stabilizer outboard auxiliary track cutout. Placed on deferred item project #xxxxx per srm 57-41-01. Upon re-inspection of damage area (xx) apr/sun/05, found to be improperly signed off per the above srm. I did not remember if I originally signed this off. Wrote up damage as being out of limits per srm 57-41-01 and placed on deferred item project to be repaired within 10 days per engineering deferral authority/authorized. On apr/tue/05 received a copy of log page #xxxxxxxx that shows that I did originally sign off the log page on aug/tue/04. So I am filing this report at this time.

Google
 

Original NASA ASRS Text

Title: A B768-400 INSPECTOR FOUND A CRACK ON L WING LEADING EDGE #4 SLAT OUTBOARD AUX TRACK CUTOUT. REPAIR DEFERRED FOR 10 DAYS. AT THE SAME TIME, THE INSPECTOR INADVERTENTLY CLRED THE DEFERRED ITEM FOR CRACK REPAIR.

Narrative: FOUND CRACK ON L LEADING EDGE WING AT #4 STAB OUTBOARD AUX TRACK CUTOUT. PLACED ON DEFERRED ITEM PROJECT #XXXXX PER SRM 57-41-01. UPON RE-INSPECTION OF DAMAGE AREA (XX) APR/SUN/05, FOUND TO BE IMPROPERLY SIGNED OFF PER THE ABOVE SRM. I DID NOT REMEMBER IF I ORIGINALLY SIGNED THIS OFF. WROTE UP DAMAGE AS BEING OUT OF LIMITS PER SRM 57-41-01 AND PLACED ON DEFERRED ITEM PROJECT TO BE REPAIRED WITHIN 10 DAYS PER ENGINEERING DEFERRAL AUTH. ON APR/TUE/05 RECEIVED A COPY OF LOG PAGE #XXXXXXXX THAT SHOWS THAT I DID ORIGINALLY SIGN OFF THE LOG PAGE ON AUG/TUE/04. SO I AM FILING THIS RPT AT THIS TIME.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.