Narrative:

Maintenance heavy modification required rivets were not installed. While working an engineering order; service bulletin X figure 2 detail; frame 41&42 between stringers 10&11 l-hand side rivets were not installed to the reinforcement. The service bulletin states to xfer the existing rivet holes to the reinforcement. There are no rivets installed in the skin at this location. The service bulletin is incorrect and conflictive. Having improper reference material and lack of experience and the conflictive diagram to statement; the rivets were not installed.

Google
 

Original NASA ASRS Text

Title: EMB-145 SERVICE BULLETIN TO REMOVE/REPLACE SPECIFIC FUSE FRAME FASTENERS. FASTENERS NOT INSTALLED.

Narrative: MAINT HVY MODIFICATION REQUIRED RIVETS WERE NOT INSTALLED. WHILE WORKING AN ENGINEERING ORDER; SVC BULLETIN X FIGURE 2 DETAIL; FRAME 41&42 BTWN STRINGERS 10&11 L-HAND SIDE RIVETS WERE NOT INSTALLED TO THE REINFORCEMENT. THE SVC BULLETIN STATES TO XFER THE EXISTING RIVET HOLES TO THE REINFORCEMENT. THERE ARE NO RIVETS INSTALLED IN THE SKIN AT THIS LOCATION. THE SVC BULLETIN IS INCORRECT AND CONFLICTIVE. HAVING IMPROPER REF MATERIAL AND LACK OF EXPERIENCE AND THE CONFLICTIVE DIAGRAM TO STATEMENT; THE RIVETS WERE NOT INSTALLED.

Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.