Narrative:

Teb 5 departure off of runway 24. After a lengthy delay for WX approaching the new york area and a complete re-routing to destination just prior to departure I leveled off high at 1720 ft on the teb 5 departure; turned to heading 280 degrees; and continued the climb to 2000 ft prior to reaching the 4.5 DME fix as stated in the SID. I attribute my poor execution of the SID to inattention to detail; and an extended delay on the ground holding number 1 for departure (2 hours).

Google
 

Original NASA ASRS Text

Title: C750 PLT FAILS TO LEVEL AT 1500 FT ON TEB SID FROM TEB.

Narrative: TEB 5 DEP OFF OF RWY 24. AFTER A LENGTHY DELAY FOR WX APCHING THE NEW YORK AREA AND A COMPLETE RE-ROUTING TO DEST JUST PRIOR TO DEP I LEVELED OFF HIGH AT 1720 FT ON THE TEB 5 DEP; TURNED TO HDG 280 DEGS; AND CONTINUED THE CLIMB TO 2000 FT PRIOR TO REACHING THE 4.5 DME FIX AS STATED IN THE SID. I ATTRIBUTE MY POOR EXECUTION OF THE SID TO INATTENTION TO DETAIL; AND AN EXTENDED DELAY ON THE GND HOLDING NUMBER 1 FOR DEP (2 HOURS).

Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.