Narrative:

Takeoff from runway 22L. Set power to 1.4 with brakes applied as aircraft rolled. Asked for auto throttle; no engagement; set power manually. Take off roll long rotated with about 2500 ft remaining. Aircraft sluggish in the climb; gear up; half rate climb power. First officer noted the tri (thrust rating indicator) was already in climb power. At cruise discussed what happened. During before start checklist read maximum takeoff looked at tri; minds eye said takeoff. In reality it was still in cl (climb). For me it was a slight fatigue problem and poor checklist discipline during that phase of the preparation to leave.

Google
 

Original NASA ASRS Text

Title: An MD80 crew completed a takeoff with climb power set after fatigue and distractions caused them to misread the TRI (Thrust Rating Indicator) setting during the pre-start checklist.

Narrative: Takeoff from Runway 22L. Set power to 1.4 with brakes applied as aircraft rolled. Asked for auto throttle; no engagement; set power manually. Take off roll long rotated with about 2500 FT remaining. Aircraft sluggish in the climb; gear up; half rate climb power. First Officer noted the TRI (Thrust Rating Indicator) was already in climb power. At cruise discussed what happened. During before start checklist read Maximum Takeoff looked at TRI; minds eye said TAKEOFF. In reality it was still in CL (Climb). For me it was a slight fatigue problem and poor checklist discipline during that phase of the preparation to leave.

Data retrieved from NASA's ASRS site as of April 2012 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.