37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 870645 |
Time | |
Date | 201001 |
Local Time Of Day | 1201-1800 |
Place | |
Locale Reference | MKE.Airport |
State Reference | WI |
Environment | |
Flight Conditions | VMC |
Light | Dusk |
Aircraft 1 | |
Make Model Name | A319 |
Operating Under FAR Part | Part 121 |
Flight Phase | Taxi |
Flight Plan | IFR |
Person 1 | |
Function | Captain |
Qualification | Flight Crew Air Transport Pilot (ATP) |
Experience | Flight Crew Last 90 Days 100 Flight Crew Total 14000 Flight Crew Type 5000 |
Person 2 | |
Function | First Officer Pilot Not Flying |
Qualification | Flight Crew Air Transport Pilot (ATP) Flight Crew Flight Instructor Flight Crew Multiengine |
Experience | Flight Crew Last 90 Days 175 Flight Crew Total 10000 Flight Crew Type 2600 |
Events | |
Anomaly | Deviation - Procedural Published Material / Policy Ground Incursion Taxiway |
Narrative:
Ground push-back from gate commenced with clearance from only one of two entities in fine print on airport chart. Due to division of tasks/workload between captain/first officer in the cockpit; poor non-typical and somewhat convoluted signage. Procedures annotated in fine print on the commercial chart; along with dealing with a new airport location; an aircraft swap and running late; a communication error was made between crew members and ramp/ground control; to where a potential conflict could have occurred. Captain was communicating with the ground crew and flight attendants; while first officer was communicating with ATC and running the checklist. Captain was assured a push clearance had been obtained; and push was commenced. However; only ramp control had given a clearance and not ground control as well. No harm done; but issue could be avoided perhaps in the future if there was some better signage on the gates stating that clearance must be received from both ramp and ground. Also better notes in bolder print be placed on the main airport diagram page of the commercial charts stating this requirement. Also perhaps overlap the cockpit tasking when it comes to getting push clearances so there are no communication errors.
Original NASA ASRS Text
Title: An Air Carrier crew did not call MKE Ground Control after receiving push back clearance from Ramp Control at one of the terminal gates requiring dual push back clearances.
Narrative: Ground push-back from gate commenced with clearance from only one of two entities in fine print on airport chart. Due to division of tasks/workload between Captain/First officer in the cockpit; poor non-typical and somewhat convoluted signage. Procedures annotated in fine print on the commercial chart; along with dealing with a new airport location; an aircraft swap and running late; a communication error was made between crew members and Ramp/Ground Control; to where a potential conflict could have occurred. Captain was communicating with the Ground Crew and Flight Attendants; while First Officer was communicating with ATC and running the checklist. Captain was assured a push clearance had been obtained; and push was commenced. However; only Ramp Control had given a clearance and not Ground Control as well. No harm done; but issue could be avoided perhaps in the future if there was some better signage on the gates stating that clearance must be received from both Ramp and Ground. Also better notes in bolder print be placed on the main airport diagram page of the commercial charts stating this requirement. Also perhaps overlap the cockpit tasking when it comes to getting push clearances so there are no communication errors.
Data retrieved from NASA's ASRS site as of April 2012 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.