37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 91278 |
Time | |
Date | 198807 |
Day | Fri |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | airport : bos |
State Reference | MA |
Environment | |
Flight Conditions | IMC |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | Widebody, Low Wing, 2 Turbojet Eng |
Navigation In Use | Other |
Flight Phase | climbout : takeoff cruise other landing other |
Route In Use | enroute : atlantic enroute : other oceanic |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | observation : company check pilot oversight : pic |
Qualification | pilot : commercial pilot : cfi pilot : atp pilot : instrument |
Experience | flight time last 90 days : 200 flight time total : 20000 flight time type : 125 |
ASRS Report | 91278 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : captain |
Qualification | pilot : atp |
Events | |
Anomaly | other anomaly other |
Independent Detector | other flight crewa |
Resolutory Action | none taken : anomaly accepted |
Consequence | faa : reviewed incident with flight crew |
Supplementary | |
Primary Problem | Flight Crew Human Performance |
Air Traffic Incident | other |
Narrative:
As a supervisory pilot check airman, I was scheduled to fly 2 flts (7/fri and 7/tue/88) with an first officer and I/O to qualify them as crewmembers, on a scheduled flight that exceeded 8 hour day for 4 days. Actual time at end of both flight sequences was 35:14 hours in 7 days. I believe this is a violation of far's 121-481. The company does not have enough check airmen to do the job and the few they do have are flying too much.
Original NASA ASRS Text
Title: POSSIBLE ILLEGAL SCHEDULE EXCEEDED 30 HOURS IN 7 DAYS.
Narrative: AS A SUPERVISORY PLT CHK AIRMAN, I WAS SCHEDULED TO FLY 2 FLTS (7/FRI AND 7/TUE/88) WITH AN F/O AND I/O TO QUALIFY THEM AS CREWMEMBERS, ON A SCHEDULED FLT THAT EXCEEDED 8 HR DAY FOR 4 DAYS. ACTUAL TIME AT END OF BOTH FLT SEQUENCES WAS 35:14 HRS IN 7 DAYS. I BELIEVE THIS IS A VIOLATION OF FAR'S 121-481. THE COMPANY DOES NOT HAVE ENOUGH CHK AIRMEN TO DO THE JOB AND THE FEW THEY DO HAVE ARE FLYING TOO MUCH.
Data retrieved from NASA's ASRS site as of August 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.