37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 924886 |
Time | |
Date | 201012 |
Local Time Of Day | 0601-1200 |
Place | |
Locale Reference | ZZZ.Airport |
State Reference | US |
Environment | |
Light | Daylight |
Aircraft 1 | |
Make Model Name | Regional Jet 200 ER/LR (CRJ200) |
Operating Under FAR Part | Part 121 |
Flight Phase | Climb |
Flight Plan | IFR |
Component | |
Aircraft Component | Gear Extend/Retract Mechanism |
Person 1 | |
Function | Dispatcher |
Qualification | Dispatch Dispatcher |
Events | |
Anomaly | Aircraft Equipment Problem Critical Deviation - Procedural Published Material / Policy |
Narrative:
Aircraft departed and called back on local radio with a gear disagree. Crew ran QRH - says land nearest suitable. Captain consulted maintenance via radio. Captain/dispatcher/maintenance concurred on air return to the departure airport. I was in the process of documenting air return. Flight coordinator rebuilt flight prior to my documenting release with note - 'air return to departure airport due gear disagree.' after rebuild release unavailable to amend. I mistakenly thought the rebuild by coordinator would take longer and I would have time to document.
Original NASA ASRS Text
Title: A CRJ200 Dispatcher reported that a flight crew declared an emergency for a landing gear disagree light and was returning to the departure airport when the dispatch release documentation was amended for the air return. The premature air return documentation prevented rebuilding the release.
Narrative: Aircraft departed and called back on local radio with a gear disagree. Crew ran QRH - says land nearest suitable. Captain consulted Maintenance via radio. Captain/Dispatcher/Maintenance concurred on air return to the departure airport. I was in the process of documenting air return. Flight Coordinator rebuilt flight prior to my documenting release with note - 'Air return to departure airport due gear disagree.' After rebuild release unavailable to amend. I mistakenly thought the rebuild by Coordinator would take longer and I would have time to document.
Data retrieved from NASA's ASRS site as of April 2012 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.