Narrative:

Takeoff on runway 33L in bos. Winds were approximately 28 kts. Gusting to 38 kts. Moderate turbulence during climb out. It was difficult during climbout trying to maintain pitch and following the flight director. I became disoriented following the flight director to where my pitch became 25 deg nose up. The first officer quickly alerted me of my high pitch attitude where I was able to correct to a normal pitch attitude. Flight continued and landed without incident. High winds; mod turbulence during climbout. I am on reserve; not having flown consistently in 2 1/2 weeks.

Google
 

Original NASA ASRS Text

Title: ERJ-190 flight crew reported becoming disoriented following flight director resulting in over pitch attitude.

Narrative: Takeoff on Runway 33L in BOS. Winds were approximately 28 kts. gusting to 38 kts. Moderate turbulence during climb out. It was difficult during climbout trying to maintain pitch and following the flight director. I became disoriented following the flight director to where my pitch became 25 deg nose up. The First Officer quickly alerted me of my high pitch attitude where I was able to correct to a normal pitch attitude. Flight continued and landed without incident. High winds; mod turbulence during climbout. I am on reserve; not having flown consistently in 2 1/2 weeks.

Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.