37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 1763262 |
Time | |
Date | 202009 |
Local Time Of Day | 1801-2400 |
Place | |
Locale Reference | ZZZ.Airport |
State Reference | US |
Environment | |
Flight Conditions | VMC |
Aircraft 1 | |
Make Model Name | B767-300 and 300 ER |
Operating Under FAR Part | Part 121 |
Flight Phase | Parked |
Flight Plan | IFR |
Person 1 | |
Function | Pilot Flying Captain |
Qualification | Flight Crew Instrument Flight Crew Multiengine Flight Crew Air Transport Pilot (ATP) |
Events | |
Anomaly | Deviation - Procedural Weight And Balance Deviation - Procedural Hazardous Material Violation Deviation - Procedural Published Material / Policy |
Narrative:
I was notified by the company [10 days after flight] that a dry ice shipment of 1042 kg was not included in the weight and balance on aircraft X. To the best of my recollection; that dry ice was included. I operate aircraft X quite frequently and it almost always requires a dry ice exception. I reviewed the flight plan release for that flight and confirmed that dry ice supplementary procedures was listed. Also; to the best of recollection; I was notified of dry ice supp. Proc. When I initialized ACARS as well as on the ACARS weight and balance. [Caused by] oversight on final paperwork. [Suggest to] have a separate acknowledgement line on the ACARS weight and balance for dry ice only.
Original NASA ASRS Text
Title: B767-300 Captain reported company notification of Hazmat documentation error ten days after flight operated.
Narrative: I was notified by the Company [10 days after flight] that a dry ice shipment of 1042 kg was not included in the weight and balance on Aircraft X. To the best of my recollection; that dry ice was included. I operate Aircraft X quite frequently and it almost always requires a Dry Ice Exception. I reviewed the Flight Plan Release for that flight and confirmed that Dry Ice Supplementary Procedures was listed. Also; to the best of recollection; I was notified of Dry Ice Supp. Proc. when I initialized ACARS as well as on the ACARS Weight and Balance. [Caused by] oversight on final paperwork. [Suggest to] have a separate acknowledgement line on the ACARS Weight and Balance for dry ice only.
Data retrieved from NASA's ASRS site and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.