Narrative:

After landing on runway 34 at pvd, on rollout, the left main tire went flat. We stopped the aircraft and contacted the tower to let them know of our situation. We did not need any emergency assistance. We deplaned the passenger with the local auths. And then, with permission of our company maintenance, we taxied the aircraft slowly and safely to the next available taxiway to clear the active runway. Supplemental information from acn 261942: after landing on runway 34 at pvd airport (6081 ft runway length) rolling approximately 3500 after touchdown point the left main tire went flat at approximately 70 KTS. I immediately stopped the aircraft with the engine power to a full stop.

Google
 

Original NASA ASRS Text

Title: ACR LTT SUFFERS FLAT TIRE DURING LNDG PROC ROLLOUT.

Narrative: AFTER LNDG ON RWY 34 AT PVD, ON ROLLOUT, THE L MAIN TIRE WENT FLAT. WE STOPPED THE ACFT AND CONTACTED THE TWR TO LET THEM KNOW OF OUR SIT. WE DID NOT NEED ANY EMER ASSISTANCE. WE DEPLANED THE PAX WITH THE LCL AUTHS. AND THEN, WITH PERMISSION OF OUR COMPANY MAINT, WE TAXIED THE ACFT SLOWLY AND SAFELY TO THE NEXT AVAILABLE TXWY TO CLR THE ACTIVE RWY. SUPPLEMENTAL INFO FROM ACN 261942: AFTER LNDG ON RWY 34 AT PVD ARPT (6081 FT RWY LENGTH) ROLLING APPROX 3500 AFTER TOUCHDOWN POINT THE L MAIN TIRE WENT FLAT AT APPROX 70 KTS. I IMMEDIATELY STOPPED THE ACFT WITH THE ENG PWR TO A FULL STOP.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.