Narrative:

Just after setting takeoff power the #2 EPR dropped to about 1.6. All other engine instruments were normal. Due to our slow speed I elected to stop the takeoff and clear the runway. After conferring with the crew and referencing the maintenance dispatch manual we returned to the gate for maintenance. First officer and engineer did a good job dealing with this problem. The decision to stop was made to give us more time to make sure our first perception of our problem was correct.

Google
 

Original NASA ASRS Text

Title: RETURN TO GATE AFTER TKOF REJECTED FOR LOW ENG PRESSURE RATIO INDICATION ON #2 ENG OF A B727.

Narrative: JUST AFTER SETTING TKOF PWR THE #2 EPR DROPPED TO ABOUT 1.6. ALL OTHER ENG INSTS WERE NORMAL. DUE TO OUR SLOW SPD I ELECTED TO STOP THE TKOF AND CLR THE RWY. AFTER CONFERRING WITH THE CREW AND REFING THE MAINT DISPATCH MANUAL WE RETURNED TO THE GATE FOR MAINT. FO AND ENGINEER DID A GOOD JOB DEALING WITH THIS PROB. THE DECISION TO STOP WAS MADE TO GIVE US MORE TIME TO MAKE SURE OUR FIRST PERCEPTION OF OUR PROB WAS CORRECT.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.