Narrative:

Normal preflight and taxi after takeoff at 1000 ft AGL received duct leak master caution. Performed duct leak checklist which eventually led us to shut down #1 engine as a precaution. Approach gave us box pattern just east of airport. Once all checklists were complete and everyone was informed, we declared emergency and landed at mco single engine without incident. Cause -- loose clamps on duct work.

Google
 

Original NASA ASRS Text

Title: FLC OF AN EMBRAER, EMB120, SHUT DOWN THE L ENG AND DECLARED AN EMER SHORTLY AFTER TKOF DUE TO A MASTER CAUTION ENG BLEED AIR DUCT LEAK.

Narrative: NORMAL PREFLT AND TAXI AFTER TKOF AT 1000 FT AGL RECEIVED DUCT LEAK MASTER CAUTION. PERFORMED DUCT LEAK CHKLIST WHICH EVENTUALLY LED US TO SHUT DOWN #1 ENG AS A PRECAUTION. APCH GAVE US BOX PATTERN JUST E OF ARPT. ONCE ALL CHKLISTS WERE COMPLETE AND EVERYONE WAS INFORMED, WE DECLARED EMER AND LANDED AT MCO SINGLE ENG WITHOUT INCIDENT. CAUSE -- LOOSE CLAMPS ON DUCT WORK.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.