Narrative:

I was the PIC of air carrier flight abc, operating from XXX-ZZZ -- ont terminating in sjc. Aircraft xyz. The aircraft was deferred for an inoperative autoplt. It was a pilot deferral recorded earlier that day (may/xa/00). Passing through ZZZ, I should have contacted maintenance to have the autoplt deferred by our maintenance per our operating specifications. I did not. We did not transit another maintenance base during the day. It is a well established and documented procedure. It was an oversight on my part.

Google
 

Original NASA ASRS Text

Title: A B737-400 WAS DISPATCHED FROM A MAINT STATION IN NON COMPLIANCE WITH A PLT DEFERRED ITEM NOT CLRED OR DEFERRED BY MAINT.

Narrative: I WAS THE PIC OF ACR FLT ABC, OPERATING FROM XXX-ZZZ -- ONT TERMINATING IN SJC. ACFT XYZ. THE ACFT WAS DEFERRED FOR AN INOP AUTOPLT. IT WAS A PLT DEFERRAL RECORDED EARLIER THAT DAY (MAY/XA/00). PASSING THROUGH ZZZ, I SHOULD HAVE CONTACTED MAINT TO HAVE THE AUTOPLT DEFERRED BY OUR MAINT PER OUR OPERATING SPECS. I DID NOT. WE DID NOT TRANSIT ANOTHER MAINT BASE DURING THE DAY. IT IS A WELL ESTABLISHED AND DOCUMENTED PROC. IT WAS AN OVERSIGHT ON MY PART.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.