37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 507220 |
Time | |
Date | 200104 |
Day | Sat |
Local Time Of Day | 1801 To 2400 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Environment | |
Light | Night |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | A330 |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
Qualification | technician : powerplant technician : airframe |
Experience | maintenance technician : 12 |
ASRS Report | 507220 |
Events | |
Anomaly | maintenance problem : improper documentation |
Resolutory Action | none taken : detected after the fact |
Supplementary | |
Problem Areas | Maintenance Human Performance |
Primary Problem | Maintenance Human Performance |
Narrative:
I complied with an ETOPS check for an airbus 330, for trans-atlantic service. Upon signing off 2 pages of logbook items and the airworthiness block, I neglected to make an entry for maintenance accomplishment of ETOPS check and the appropriate action taken and required signoff as per ETOPS check card. Note: the logbook write-ups and ETOPS check were addressed/complied with. Aircraft was dispatched under nominal conditions save for the omitted written ETOPS complied/entry/signoff in the logbook. This omission was not discovered until after the aircraft was dispatched and en route for europe, perhaps 1/2 hour after dispatch. For whatever an excuse, I neglected this requirement and can see any future times pertaining to this like situation to be ensconced in memory and not fail in administering this requirement.
Original NASA ASRS Text
Title: AN ETOPS CHK WAS COMPLETED BUT THE PROPER LOG SIGNOFF WAS NOT ACCOMPLISHED ON AN AIRBUS 330.
Narrative: I COMPLIED WITH AN ETOPS CHK FOR AN AIRBUS 330, FOR TRANS-ATLANTIC SVC. UPON SIGNING OFF 2 PAGES OF LOGBOOK ITEMS AND THE AIRWORTHINESS BLOCK, I NEGLECTED TO MAKE AN ENTRY FOR MAINT ACCOMPLISHMENT OF ETOPS CHK AND THE APPROPRIATE ACTION TAKEN AND REQUIRED SIGNOFF AS PER ETOPS CHK CARD. NOTE: THE LOGBOOK WRITE-UPS AND ETOPS CHK WERE ADDRESSED/COMPLIED WITH. ACFT WAS DISPATCHED UNDER NOMINAL CONDITIONS SAVE FOR THE OMITTED WRITTEN ETOPS COMPLIED/ENTRY/SIGNOFF IN THE LOGBOOK. THIS OMISSION WAS NOT DISCOVERED UNTIL AFTER THE ACFT WAS DISPATCHED AND ENRTE FOR EUROPE, PERHAPS 1/2 HR AFTER DISPATCH. FOR WHATEVER AN EXCUSE, I NEGLECTED THIS REQUIREMENT AND CAN SEE ANY FUTURE TIMES PERTAINING TO THIS LIKE SIT TO BE ENSCONCED IN MEMORY AND NOT FAIL IN ADMINISTERING THIS REQUIREMENT.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.