Narrative:

On nov/wed/01 at about XA30, was advised that it is possible that I could have manufactured 1/4 inch cables using the wrong number of strands. We used 7 X 19 -- should have used 6 X 31. Both have the same breaking strength. I was off wack on nov/thu/01. That is why I am reporting this on nov/fri/01.

Google
 

Original NASA ASRS Text

Title: AN MD80 WAS DISPATCHED IN NON COMPLIANCE FROM SCHEDULED MAINT WITH THE INCORRECT SLAT DRIVE CABLE INSTALLED.

Narrative: ON NOV/WED/01 AT ABOUT XA30, WAS ADVISED THAT IT IS POSSIBLE THAT I COULD HAVE MANUFACTURED 1/4 INCH CABLES USING THE WRONG NUMBER OF STRANDS. WE USED 7 X 19 -- SHOULD HAVE USED 6 X 31. BOTH HAVE THE SAME BREAKING STRENGTH. I WAS OFF WACK ON NOV/THU/01. THAT IS WHY I AM RPTING THIS ON NOV/FRI/01.

Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.