Attributes | |
ACN | 613559 |
Time | |
Date | 200403 |
Day | Sat |
Local Time Of Day | 1801 To 2400 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Environment | |
Light | Night |
Aircraft 1 | |
Operator | common carrier : air carrier |
Make Model Name | MD-80 Series (DC-9-80) Undifferentiated or Other Model |
Operating Under FAR Part | Part 121 |
Flight Plan | IFR |
Aircraft 2 | |
Flight Phase | ground : parked ground : maintenance |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
ASRS Report | 613559 |
Person 2 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
ASRS Report | 613561 |
Events | |
Anomaly | aircraft equipment problem : less severe maintenance problem : improper documentation non adherence : far non adherence : published procedure |
Independent Detector | other other : person 1 |
Resolutory Action | none taken : detected after the fact |
Consequence | other other |
Factors | |
Maintenance | contributing factor : engineering procedure contributing factor : schedule pressure performance deficiency : logbook entry performance deficiency : non compliance with legal requirements |
Supplementary | |
Problem Areas | Flight Crew Human Performance Maintenance Human Performance Company Aircraft Chart Or Publication |
Primary Problem | Company |
Narrative:
On mar/thu/04 at XA00, we continued the fabrication of temporary repair. Returned at XA00 on mar/fri/04 and completed installation of temporary repair doubler. The completion meter message was sent after we had left the terminal the following morning. We arrived and the logbook had been signed off as airworthy and aircraft had been released. Supplemental information from acn 613561: the aircraft flew on a maintenance ferry flight without the work being signed off.
Original NASA ASRS Text
Title: AN MD80 WAS DISPATCHED IN NON COMPLIANCE WITH AN INTERIM SHEET METAL REPAIR ACCOMPLISHED OFF LINE, BUT NOT SIGNED OFF IN LOGBOOK.
Narrative: ON MAR/THU/04 AT XA00, WE CONTINUED THE FABRICATION OF TEMPORARY REPAIR. RETURNED AT XA00 ON MAR/FRI/04 AND COMPLETED INSTALLATION OF TEMPORARY REPAIR DOUBLER. THE COMPLETION METER MESSAGE WAS SENT AFTER WE HAD LEFT THE TERMINAL THE FOLLOWING MORNING. WE ARRIVED AND THE LOGBOOK HAD BEEN SIGNED OFF AS AIRWORTHY AND ACFT HAD BEEN RELEASED. SUPPLEMENTAL INFO FROM ACN 613561: THE ACFT FLEW ON A MAINT FERRY FLT WITHOUT THE WORK BEING SIGNED OFF.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.