ACN | 675802 |
Time | |
Date | 200510 |
Local Time Of Day | 0001 To 0600 |
Place | |
Locale Reference | airport : zzz.airport |
State Reference | US |
Altitude | agl single value : 0 |
Aircraft 1 | |
Controlling Facilities | tower : tjsj.tower |
Operator | common carrier : air carrier |
Make Model Name | B767-200 |
Operating Under FAR Part | Part 121 |
Aircraft 2 | |
Flight Phase | ground : maintenance |
Person 1 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
Qualification | technician : airframe technician : powerplant |
Experience | maintenance lead technician : 4 |
ASRS Report | 675802 |
Person 2 | |
Affiliation | company : air carrier |
Function | maintenance : technician |
Events | |
Anomaly | aircraft equipment problem : critical maintenance problem : improper maintenance maintenance problem : improper documentation non adherence : far non adherence : published procedure |
Independent Detector | other other : 3 |
Resolutory Action | none taken : detected after the fact |
Consequence | other |
Factors | |
Maintenance | contributing factor : work cards contributing factor : schedule pressure contributing factor : manuals performance deficiency : logbook entry performance deficiency : non compliance with legal requirements performance deficiency : inspection |
Supplementary | |
Problem Areas | Chart Or Publication Maintenance Human Performance Aircraft |
Primary Problem | Maintenance Human Performance |
Narrative:
Right-hand main landing gear brace actuator written up for leakage. Previous shift accomplished right&right up to amm 32-32-02 page 404 step 3E(9). Completion of right&right procedures from step 3E(9) to step 3E(20) was done by another shift. The job was not inspected. Had engine change on same aircraft going on; and tending to other workloads.
Original NASA ASRS Text
Title: A B767-200 WAS DISPATCHED AFTER MAINT REPLACED THE R MAIN LNDG GEAR DRAG BRACE ACTUATOR WITHOUT THE FAA REQUIRED INSPECTION ACCOMPLISHED.
Narrative: R-HAND MAIN LNDG GEAR BRACE ACTUATOR WRITTEN UP FOR LEAKAGE. PREVIOUS SHIFT ACCOMPLISHED R&R UP TO AMM 32-32-02 PAGE 404 STEP 3E(9). COMPLETION OF R&R PROCS FROM STEP 3E(9) TO STEP 3E(20) WAS DONE BY ANOTHER SHIFT. THE JOB WAS NOT INSPECTED. HAD ENG CHANGE ON SAME ACFT GOING ON; AND TENDING TO OTHER WORKLOADS.
Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.