Narrative:

A standardization to change uret to strips must be established. I took over a radar position during this transition; and had an operational error within 2 mins. No strips; no uret; just 'wingin' it' the best I could. I have repeatedly complained of the lack of organization during this transition. It wasn't clear who I had communication with and whom I didn't; and in the confusion I thought I was using 'altitude leaving' to separate said aircraft.

Google
 

Original NASA ASRS Text

Title: ZTL CTLR EXPERIENCED OPERROR AT FL340 DURING POS RELIEF AND TRANSITION FROM STRIPS TO URET OPS.

Narrative: A STANDARDIZATION TO CHANGE URET TO STRIPS MUST BE ESTABLISHED. I TOOK OVER A RADAR POS DURING THIS TRANSITION; AND HAD AN OPERROR WITHIN 2 MINS. NO STRIPS; NO URET; JUST 'WINGIN' IT' THE BEST I COULD. I HAVE REPEATEDLY COMPLAINED OF THE LACK OF ORGANIZATION DURING THIS TRANSITION. IT WASN'T CLR WHO I HAD COM WITH AND WHOM I DIDN'T; AND IN THE CONFUSION I THOUGHT I WAS USING 'ALT LEAVING' TO SEPARATE SAID ACFT.

Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.