Narrative:

Aircraft authority/authorized by manufacturer to remain in service provided the fasteners installed are inspected every 20 flight cycles and replaced within 100 flight cycles. During heavy weight modification order #1 step 26 frame 52 right side; the mechanic inadvertently installed the wrong rivet type fasteners. I did not know the wrong rivets were installed when I rii the final product. The engineering order picture is not very clear and somewhat hard to read. We realized this mishap while doing this engineering order on another heavy modification aircraft here at (sta).

Google
 

Original NASA ASRS Text

Title: AN EMB145 WAS RELEASED FOR SVC AFTER A MODIFICATION WHERE THE INCORRECT RIVETS WERE INSTALLED AT FRAME 52 R. ENGINEERING DRAWING SYMBOLS BLURRY.

Narrative: ACFT AUTH BY MANUFACTURER TO REMAIN IN SVC PROVIDED THE FASTENERS INSTALLED ARE INSPECTED EVERY 20 FLT CYCLES AND REPLACED WITHIN 100 FLT CYCLES. DURING HVY WT MODIFICATION ORDER #1 STEP 26 FRAME 52 R SIDE; THE MECH INADVERTENTLY INSTALLED THE WRONG RIVET TYPE FASTENERS. I DID NOT KNOW THE WRONG RIVETS WERE INSTALLED WHEN I RII THE FINAL PRODUCT. THE ENGINEERING ORDER PICTURE IS NOT VERY CLR AND SOMEWHAT HARD TO READ. WE REALIZED THIS MISHAP WHILE DOING THIS ENGINEERING ORDER ON ANOTHER HVY MODIFICATION ACFT HERE AT (STA).

Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.