37000 Feet | Browse and search NASA's Aviation Safety Reporting System |
|
Attributes | |
ACN | 424309 |
Time | |
Date | 199812 |
Day | Sun |
Local Time Of Day | 0601 To 1200 |
Place | |
Locale Reference | airport : clt |
State Reference | NC |
Altitude | agl bound lower : 0 agl bound upper : 0 |
Environment | |
Light | Daylight |
Aircraft 1 | |
Operator | common carrier : air carrier |
Flight Phase | ground : preflight |
Flight Plan | IFR |
Person 1 | |
Affiliation | company : air carrier |
Function | flight crew : captain oversight : pic |
Qualification | pilot : cfi pilot : flight engineer |
Experience | flight time last 90 days : 210 flight time total : 16000 flight time type : 800 |
ASRS Report | 424309 |
Person 2 | |
Affiliation | company : air carrier |
Function | flight crew : first officer |
Qualification | pilot : commercial |
Events | |
Anomaly | non adherence : published procedure non adherence : far other anomaly other |
Independent Detector | other flight crewa |
Resolutory Action | none taken : detected after the fact |
Consequence | Other |
Supplementary | |
Air Traffic Incident | other |
Narrative:
We had a scheduled aircraft change in clt. System then switched aircraft scheduled for our tpa flight. Our new aircraft was running late. When aircraft arrived, all preflight functions were performed and we departed. During the crew change, things were very busy. Maintenance was in and out of cockpit. Numerous communications with company due to weight and balance problems/delays. The flight release we received was for the aircraft originally scheduled for the flight and did not reflect the aircraft change. We did not notice this mistake until we were airborne.
Original NASA ASRS Text
Title: A B737-300 WAS DISPATCHED WITH THE WRONG ACFT DISPATCH RELEASE DOCUMENT. WRONG DOCUMENT DISCOVERED INFLT.
Narrative: WE HAD A SCHEDULED ACFT CHANGE IN CLT. SYS THEN SWITCHED ACFT SCHEDULED FOR OUR TPA FLT. OUR NEW ACFT WAS RUNNING LATE. WHEN ACFT ARRIVED, ALL PREFLT FUNCTIONS WERE PERFORMED AND WE DEPARTED. DURING THE CREW CHANGE, THINGS WERE VERY BUSY. MAINT WAS IN AND OUT OF COCKPIT. NUMEROUS COMS WITH COMPANY DUE TO WT AND BAL PROBS/DELAYS. THE FLT RELEASE WE RECEIVED WAS FOR THE ACFT ORIGINALLY SCHEDULED FOR THE FLT AND DID NOT REFLECT THE ACFT CHANGE. WE DID NOT NOTICE THIS MISTAKE UNTIL WE WERE AIRBORNE.
Data retrieved from NASA's ASRS site as of July 2007 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.