Narrative:

Dfw departure clare 2 RNAV climbing through FL300 ft worth 126.57. Waypoints poten and tekbe were omitted because after clare 2 was loaded in GPS failed to select transition. This put us approximately 20 degrees south of course. ATC gave us heading to correct. No conflict. ATC said no problem. We did compare GPS vs flight plan at gate. I read from GPS while first officer checked flight plan. First officer did not pick up omission of waypoints. We discussed the event and vowed to be more vigilant.

Google
 

Original NASA ASRS Text

Title: MD80 FAILS TO PROGRAM REQUIRED ENRTE TRANSITION ON RNAV SID FROM DFW.

Narrative: DFW DEP CLARE 2 RNAV CLBING THROUGH FL300 FT WORTH 126.57. WAYPOINTS POTEN AND TEKBE WERE OMITTED BECAUSE AFTER CLARE 2 WAS LOADED IN GPS FAILED TO SELECT TRANSITION. THIS PUT US APPROX 20 DEGS S OF COURSE. ATC GAVE US HEADING TO CORRECT. NO CONFLICT. ATC SAID NO PROB. WE DID COMPARE GPS VS FLT PLAN AT GATE. I READ FROM GPS WHILE FO CHKED FLT PLAN. FO DID NOT PICK UP OMISSION OF WAYPOINTS. WE DISCUSSED THE EVENT AND VOWED TO BE MORE VIGILANT.

Data retrieved from NASA's ASRS site as of January 2009 and automatically converted to unabbreviated mixed upper/lowercase text. This report is for informational purposes with no guarantee of accuracy. See NASA's ASRS site for official report.